We had door hangers saying that Gigapower is coming soon in Januray. Sub contractors finally came in February and installed orange conduit, pedestals next to the old pedestals and handholes at just about every house. The contractors have left and the hand holes are empty. I saw a few AT&T splice trucks hanging fiber on the poles last week with fiber coming down the pole wrapped up in a coil. We currently have FITL DSL in the neighboorhood and was wondering when does AT&T actually run the fiber from the pedestal to the handholes.
↧