Has anyone else had a survey crew out inspecting the easment in their backyard in preparation for Gigapower? A crew was going around my neighborhood last week inspecting and mapping out the easements and where the existing At&t, Comcast, and Electric equipment is. They mentioned At&t should be out within 6-9 months to run fiber for Gigapower. I am in the Southwest Houston area. Has anyone else seen At&t doing this? My neighborhood was built in the 70's and everything is underground. Its one of those things that I will believe when I see it. It would be nice though, the fastest U-Verse I can get is 18Mbps and even that had trouble, so I have to deal with Comcast instead.
--
Fiber Optics is the future of high-speed internet access. Stop by the BBR Fiber Optic Forum
↧