Quantcast
Channel: AT&T U-verse forum - dslreports.com
Viewing all 11270 articles
Browse latest View live

Question's about Uverse profile provisioning

$
0
0
i know yesterday i noticed i was under a 80 line 1 and 80 line 2 and my speed tests where always over 105+mbps i had to unplug my modem yesterday to clean and plug it back up and now i am back on this profile i know my lines can support the 80/80/20 bonded but why did AT&T put me on the 50/50/20 which now my tests does not go above 90mbps could i call them and request them to put me on another provisioning profile which mine lines can support 200+mbps even the installer that installed our service said we could reach that speed with a bonded pair. So why did at&t put me back on the 50/50/20 when that no where tests in 100mbps

U-verse in Borger, TX

$
0
0
Does anyone know if Borger, TX get internet U-verse? I have called SEVERAL people and have gotten different answers.

U-verse "Phase Out"

$
0
0
I keep hearing rumors that U-verse is getting phased out and the users will be pushed toward DirecTV, yet I have yet to hear from AT&T that this will eventually happen.... Then yesterday, someone came by the house (I wasn't home) and told my wife that he was from AT&T (he was wearing a DirecTV shirt) and that we had "old" U-verse boxes and that he could upgrade them for us and get us a bunch more channels and stuff. Scary thing is, she said he had a little computer that had all of our account info on it. I wouldn't think that AT&T would actually send people door to door and explain that our "cable boxes" were "old." I figure that they would somehow contact us directly from corporate. So does anybody actually have the straight poop on what is going on with this rumored "phase-out?" It would be too bad, my U-verse has been working flawlessly for about seven years now and I think the user interface on the boxes is better than anything else I have tried, and I have never used anything other than a wired connection -- I've never had a dish before.

5268ac fxn gateway packet filter capable?

$
0
0
new u verse customer today. Want to set up packet filtering like in my previous att dsl gateway. Can't find it! Can this gateway do packet filtering? No problem with application pinholes but want to block some ports and some I.P.'s. TIA..perry

Issues with my ATT Uverse Internet Service Again

$
0
0
Hello To whom it may concern Below is a summary of my general problem. Since June 27, 2017 I have been having problems with my internet. All of a sudden. I have a Pace 5286AC Modem and the Broadband Light 2 started Blinking Red and I waited to see if it would revert back to green but, at this point my Internet went down. I was able to get on the internet again by going into the modem settings and changing the broadband Configuration Settings Line Selection from Dual Line To Line 1. But at half the speed I was used to, I had the 50mbps plan/10 upload plan when using two lines so I was pair bonded. I immediately went to speedtest.net and I also did the ATT Speedtest and noticed when I ran the speedtest I was and am still getting 35.56mbps Download/5.89mbps Upload before I was getting 50-55mbps Download/12-14mbps. I Uploaded today by running Uverse Realtime and I noticed that before my est. distance from vrad was 1,295ft but now it has changed to 300ft and when I log into my att it also says the following message Important notice: Your Internet plan is no longer offered. If you change to a new plan, you won't be able to switch back to your current plan and it only offers me the 25mbps plan. Is there any way to get my previous speed back or any higher speed if it is possible? I have looked at the houses around me and its only my block that went down to 25mbps and one house says 18mbps. The block behind mine all the houses say 50mbps the block next to me all the houses say 50mbps as well. It is only my block that the houses say 25mbps. If anybody could be of some assistance and resolve my issues I would be most appreciative. Thanks In Advance For Replying

more about AT&T phase-out of copper POTS

$
0
0
I was feeling guilty about inadvertently hijacking someone else's thread, sorry, so I thought that instead of going off on yet another tangent, I'd start a new thread in the series about disappearing analog POTS and the old ("legacy") ADSL that co-exists with it. Previous discussions include: https://www.dslreports.com/forum/r31485353-AT-T-phase-out-of-copper-pots https://www.dslreports.com/forum/r31492297-Services-What-does-this-mean And as we all know, the phase-out is ongoing and there's no way it can be prevented; the last I heard, AT&T had purchased legislative approval in 19 out of its 20 states, and the FCC is guaranteed to rubber-stamp everything and call that George. OK, so this is quoted from: https://www.dslreports.com/forum/r31497812-AT-T-answers-needed~start=58 said by uid://1923980 :It's going to go away faster than people realize, copper is unbelievably expensive to maintain and about all it is used for anymore is data, POTS is history excepting a few bitter clingers who refuse to give up their 500 series rotary desk sets. IOW, and no offense intended: "Ya cain't fight Progress, sonny!" That's a perfectly understandable attitude and I imagine that it's shared by 90+% of the readers here, but it ignores at least one huge point. We all enjoy being techno-geeks and playing with our high-tech toys, but as I said in that other thread the other day, think of your grandparents who don't watch screaming video and don't play video games. (And if your grandparents happen to be dead, they for sure don't watch screaming video; I rest my case.) What I'm talking about this time is analog voice telephone service. It worked even when there was a power failure (potentially lasting many hours) in the house or apartment building, and it was trivially easy & quick to call 911 to get the fire department or the paramedics, and it didn't rely on failure-prone radio transceivers or the level of battery charge in the handset, and when there was inevitably that power failure sooner or later, you could pick up the phone and call the electric utility's 800 number to report it just to be sure that someone would get on it and restore power ASAP (and your phone number and street address were already on record, so with the automated system it was just a matter of pressing "1" a few times). And some oldsters use medical monitoring devices or emergency-call buttons ("I've fallen and I can't get up") that dial out on the voice phone line. Some of 'em also have medium-tech, non-digital burglar alarms in their houses that do automated analog dial-outs. And a very important point is that POTS in the vast majority of cases didn't cost those poor old geezers an arm and a leg per month; usually $25 or so would do it. In fact, one of SBC's worst nightmares was "Consumer's Choice Basic" voice at $10 or less: https://citizensutilityboard.org/cubs-five-simple-steps-lower-phone-bills/ Well, what are "the old folks at home" left with now? Mobile cellular or fixed wireless or U-verse VoIP or some vaguely promised fiber "solution" eventually. Is that gonna fill the bucket? I dunno about your parents & grandparents, but mine would have sooner played shoot-'em-up multiplayer video games on the Innertubes than figure out all the intricacies of using a cellular phone. (My folks did actually have a WE 500 phone for the longest time until they replaced it with a 2500, which they thought was wonderfully high-tech. But OK, that was a while ago.) Fixed wireless requires a black box with batteries, and so does U-verse VoIP, and the batteries are only good for some number of hours, and with U-verse VoIP, AT&T stupidly adds insult to injury by refusing to provide a battery to begin with! (I mean, WTF?!? Come on, get a small clue, you random suitdroids at AT&T corporate.) A lot of gizmos that do automated dial-outs are not compatible with VoIP, although I understand that depends partly on what codecs the telco uses. (Interesting information about fax, that was, thanks to quetwo the other day.) All of this and more is why you occasionally read in news articles about geezers' organizations like AARP getting involved in lobbying Congress to try to stop or delay the phase-out of analog POTS. Unfortunately, it's futile lobbying, as all such populist and/or anti-corporate attempts are now. I just thought I'd mention it FWIW. It doesn't affect me personally, but I can certainly sympathize and empathize and stuff.

AT&T Gigapower rollout in the CA Bay Area

$
0
0
Hi all, A friend of mine just had Gigapower installed at his residence in San Jose. During the installation appointment, the techs mentioned that AT&T's goal is to roll out Gigapower within the entire Bay Area by the end of 2017. Wondering how true that is? I live in a subdivision that was built in 2002 and right across from me is a brand new subdivision which is gigapower wired and yet mine is not :( Hoping they'd fix that soon as I would like some sweet gigabit juice as opposed to being stuck with Comcast :\ Thanks!

Active port block?

$
0
0
I have a 33kbs audio stream outbound on port 9017. This has working just fine for quite a while. Then last night around 10PM it just dies. I switched it to port 9016 and it works just fine again. So did they just block the port? I guess that was on net neutrality day too.. :)

HOA Bulk Deal

$
0
0
Hi, AT&T is currently running FTTH in our area and has come to our HOA with a bulk deal. They're offering symmetric 100 Mbps for $25/month and internet+U200 TV (if bundled with internet) for $55/month with 8 year contract. Is that a good deal for bulk deals? And whats everyone's opinion on this? Should the HOA do a bulk deal or are we better off letting the providers compete with each other (we have 3 providers in our community, and all 3 should be FTTH within a year, one already is)

Gigapower [Fiber] - Mega List - Deployed/Being Deployed

$
0
0
Please Reply to Thread with |[State]| and |[City]| as well as |Neighborhood| or |Apartment Complex| or |Residence Name| if it has [Gigapower Currently Active] or they are currently [Deploying Gigapower]. Specific Gigapower Locations will then be Appended Into Original First Post from Thread Replies. Alabama City of Adger Johns Road - Gigapower Completed - Able to order [Active] 4000 Block of Mud Creek Road - Gigapower Completed - Able to order [Active] Valley Ford Road - Gigapower Completed - Able to order [Active] City of Bessemer Morgans Run - Gigapower being Deployed [In Progress] City of Birmingham Belvedere Cove - Gigapower Completed - Able to Order [Active] Regent Park - Gigapower Completed - Able to Order [Active] Village at Highland Lakes - Gigapower Completed - Able to Order [Active] Dunnavant Place at Highland Lakes - Gigapower Completed - Able to Order [Active] Highland Lakes - Gigapower being Deployed [In Progress] [ Partial Availability ] Dunnavant Square - Gigapower Completed - Able to Order [Active] Birch Creek - Gigapower Completed - Able to Order [Active] Riverwoods - Gigapower Completed - Able to Order [Active] Village Green - Gigapower Completed - Able to Order [Active] Grand Reserve at Pelham (MDU) - Gigapower Completed Able to Order [Active] The Village at Lakeshore Crossings (MDU) - Gigapower Completed Able to Order [Active] 4700 Colonnade (MDU) - Gigapower Completed Able to Order [Active] Tapestry Park (MDU) - Gigapower Completed Able to Order [Active] Emerald Ridge - Gigapower Completed Able to Order [Active] Kelham Grove - Gigapower Completed Able to Order [Active] Villages of Westover - Gigapower Completed - Able to Order [Active] English Village - Gigapower Completed - Able to Order [Active] Altadena Lake (Area) - Gigapower being Deployed [In Progress] City of Calera Long Branch - Gigapower Completed - Able to order [Active] Savannah Pointe - Gigapower Completed - Able to order [Active] Nottingham- Gigapower Completed - Able to order [Active] City of Chelsea Chelsea Park - Gigapower Completed - Able to order [Active] Forest Lakes - Gigapower Completed - Able to order [Active] Willow Oaks - Gigapower Completed - Able to order [Active] City of Daphne Avalon - Gigapower Completed - Able to order [Active] City of Deatsville Pinetuckett - Gigapower Completed Able to Order [Active] Wind Ridge - Gigapower Completed - Able to order [Active] City of Greenpond Caffee Junction/Greenpond Road - Gigapower being Deployed [In Progress] City of Hartselle Shoal Creek Estates - Gigapower being Deployed [In Progress] Lake South - Gigapower being Deployed [In Progress] City of Helena Silver Lakes - Gigapower Completed - Able to order [Active] [ Partial Availability ] Long Leaf Lake - Gigapower being Deployed [In Progress] Laurel Lakes - Gigapower Completed - Able to order [Active] Riverwoods (New Section Only) - Gigapower being Deployed [In Progress] Hillsboro - Gigapower Completed - Able to order [Active] Old Cahaba (New Section) - Gigapower Completed - Able to order [Active] Sterling Lakes - Gigapower Completed - Able to order [Active] City of Hoover Lake Cyrus - Gigapower Completed - Able to order [Active] Ross Bridge - Gigapower Completed - Able to order [Active] Ridge Pass - Gigapower Completed - Able to order [Active] Magnolia Grove - Gigapower Completed - Able to order [Active] City of Huntsville The Villas at Nature Walk Apartments - Gigapower Completed - Able to order [Active] Artisan Twickenham Square - Gigapower Completed - Able to order [Active] Savannah (Town of Triana) - Gigapower Completed - Able to order [Active] Rock Creek- Gigapower Completed - Able to order [Active] Brairfork Village - Gigapower being Deployed [In Progress] City of McCalla Bent Brook - Gigapower Completed Able to Order [Active] Pocahontas Road - Gigapower Completed Able to Order [Active] Bluff Ride Road - Gigapower Completed Able to Order [Active] Lou George Loop - Gigapower Completed Able to Order [Active] McClendon Chapel - Gigapower Completed Able to Order [Active] 2000 Block Eastern Valley Road - Gigapower being Deployed [In Progress] City of Mobile Newman Crossing - Gigapower Completed - Able to order [Active] Taylor Pointe - Gigapower Completed - Able to order [Active] Turtle Creek - Gigapower Completed - Able to order [Active] Summerglen - Gigapower Completed - Able to order [Active] Holley Branch - Gigapower Completed - Able to order [Active] Oakridge - Gigapower being Deployed [In Progress] Legacy - Gigapower Completed - Able to order [Active] Cambridge Place - Gigapower Completed - Able to order [Active] Trailwood - Gigapower Completed - Able to order [Active] City of Montgomery Maxwell Air Force Base - Gigapower Completed - Able to order [Active] City of Muscle Shoals Royal Crest Apartments - Gigapower Completed - Able to order [Active] City of Pelham Holland Lakes - Gigapower being Deployed [In Progress] City of Semmes Brooklyn's Way - Gigapower Completed - Able to order [Active] Winchester - Gigapower Completed - Able to order [Active] City of Toney Briarfork Village - Gigapower Completed - Able to order [Active] City of Tuscaloosa Oak Trace Apartments - Gigapower Completed - Able to order [Active] Myers Flats Apartments - Gigapower Completed - Able to order [Active] 2700 Capitol Park Apartments - Gigapower Completed - Able to order [Active] City of Vance Oak Ridge - Gigapower Completed - Able to Order [Active] City of West Blocton 912 Main Street - Gigapower Completed - Able to order [Active] City of Woodstock 27069 Highway 5 (Area) - Gigapower Completed - Able to order [Active] Arkansas City of Bryant Lakes at Hurricane Creek Apartments - Gigapower Completed - Able to order [Active] City of Little Rock Lakes at Hurricane Creek - Gigapower Completed - Able to order [Active] Bentley Court - Gigapower Completed - Able to order [Active] City of Little Rock Metropolitan Village Apartments - Gigapower Completed - Able to order [Active] Cumberland Manor Apartments - Gigapower Completed - Able to order [Active] California City of Aliso Viejo Vantis Apartments - Gigapower being Deployed [In Progress] City of Bloomington Apt's Above Bloomington Library - Gigapower Completed - Able to order [Active] City of Davis The Cannery - Gigapower Completed - Able to order [Active] City of Eastvale Inspiration - Gigapower Completed - Able to order [Active] City of Bloomington Chandler Ranch - Gigapower Completed - Able to order [Active] City of Bloomington Wyngate - Gigapower Completed - Able to order [Active] City of Folsom Parkshore - Gigapower Completed - Able to order [Active] City of Fontana Minerva Manor Apartments - Gigapower Completed - Able to order [Active] Toscana Apartments - Gigapower Completed - Able to order [Active] Providence HOA Complex - Gigapower Completed - Able to order [Active] Shady Trails HOA Complex - Gigapower Completed - Able to order [Active] Adelina Condominiums - Gigapower Completed - Able to order [Active] Sierra Crest - Gigapower Completed - Able to order [Active] Bella Strada - Gigapower Completed - Able to order [Active] Camino Pacific - Gigapower Completed - Able to order [Active] Vista Paseo - Gigapower Completed - Able to order [Active] Harmony - Gigapower Completed - Able to order [Active] City of Fremont Glenmoor Gardens - Gigapower Completed - Able to order [Active] City of Fresno Boulder Creek Apartments - Gigapower Completed - Able to order [Active] Copper River Homes - Gigapower Completed - Able to order [Active] City of Irvine Portola Hills - Gigapower Completed - Able to order [Active] Kelvin Apartments - Gigapower being Deployed [In Progress] City of Jurupa Valley Harvest Villages - Gigapower Completed - Able to order [Active] Riverbend - Gigapower Completed - Able to order [Active] City of Lake Forest Avalon Apartments at Baker Ranch - Gigapower Completed - Able to order [Active] City of Los Angeles 7800-8099 Agnew Avenue - Gigapower Completed - Able to order [Active] Canoga Park - Gigapower Completed - Able to order [Active] 7800-8393 Dunbarton Avenue - Gigapower Completed - Able to order [Active] 7701-8045 Denrock Avenue (odd numbers) - Gigapower Completed - Able to order [Active] 8000-8392 Westlawn Avenue - Gigapower Completed - Able to order [Active] 8000-8388 Stewart Avenue - Gigapower Completed - Able to order [Active] 8000-8396 Kenyon Avenue - Gigapower Completed - Able to order [Active] 8000-8388 Chase Avenue - Gigapower Completed - Able to order [Active] 8000-8536 McConnell Avenue - Gigapower Completed - Able to order [Active] 8200-8353 Creighton Avenue - Gigapower Completed - Able to order [Active] 8001-8421 Georgetown Avenue - Gigapower Completed - Able to order [Active] 8000-8433 Regis Way - Gigapower Completed - Able to order [Active] 8000-8433 Holy Cross Place - Gigapower Completed - Able to order [Active] 8000-8426 Loyola Boulevard (even addresses) - Gigapower Completed - Able to order [Active] 6900-6940 West 84th Place - Gigapower Completed - Able to order [Active] 7000-7080 West 85th Street - Gigapower Completed - Able to order [Active] 6836-6933 West 85th Place - Gigapower Completed - Able to order [Active] Woodland Hills - Gigapower Completed - Able to order [Active] West Hills - Gigapower Completed - Able to order [Active] Northridge - Gigapower being Deployed [In Progress] Porter Ranch - Gigapower being Deployed [In Progress] Van Nuys - Gigapower Completed - Able to order [Active] IMT Sherman Circle Apartments - Gigapower Completed - Able to order [Active] Altadena - Gigapower being Deployed [In Progress] Winnetka Village Apartments - Gigapower Completed - Able to order [Active] City of Mission Viejo Adagio Apartments - Gigapower Completed - Able to order [Active] City of Mountain View Rex Manor - Gigapower Completed - Able to order [Active] City of Oakland Adam's Point - Gigapower Completed - Able to order [Active] City of Orange Presidential Tract - Gigapower Completed - Able to order [Active] City of Palmdale The Vineyards - Gigapower Completed - Able to order [Active] City of Rialto Rosena Ranch (HOA) - Gigapower Completed - Able to order [Active] City of Riverside Viano at Riverwalk - Gigapower Completed - Able to order [Active] Overture at Riverwalk - Gigapower Completed - Able to order [Active] The Paseos at Magnolia - Gigapower Completed - Able to order [Active] Cedar Glen - Gigapower Completed - Able to order [Active] Lux Liv @ Tyler - Gigapower Completed - Able to order [Active] Vintage at Snowberry - Gigapower Completed - Able to order [Active] 807 West - Gigapower Completed - Able to order [Active] City of Sacramento Natomas - Miramonte & Trovas Apartments - Gigapower being Deployed [In Progress] Roseville - Gigapower Completed - Able to order [Active] Rocklin - Gigapower Completed - Able to order [Active] Lincoln - Gigapower Completed - Able to order [Active] Northgate - Gigapower Completed - Able to order [Active] East Sacramento - Gigapower Completed - Able to order [Active] Natomas - Gigapower Completed - Able to order [Active] Curtis Park - Gigapower Completed - Able to order [Active] Southport - Gigapower Completed - Able to order [Active] Land Park - Gigapower Completed - Able to order [Active] Regatta at the Rivers Condos - Gigapower Completed - Able to order [Active] Rivers Senior Apartments - Gigapower Completed - Able to order [Active] Capitol Yards Apartments - Gigapower Completed - Able to order [Active] Artisan Square/Cortile & Portisol Condos - Gigapower Completed - Able to order [Active] Willow Glen Apartments - Gigapower Completed - Able to order [Active] Varenna Senior Apartments - Gigapower Completed - Able to order [Active] Anton Arcade Apartments - Gigapower Completed - Able to order [Active] Arden Park - Gigapower being Deployed [In Progress] Arden Oaks - Gigapower being Deployed [In Progress] Garden of the Gods - Gigapower being Deployed [In Progress] Del Paso Manor - Gigapower being Deployed [In Progress] Midtown - Tapestri Square Development - Gigapower Completed - Able to order [Active] Natomas Meadows - Gigapower Completed - Able to order [Active] Wetshore - Gigapower Completed - Able to order [Active] The Hamptons - Gigapower Completed - Able to order [Active] Natomas Field - Gigapower Completed - Able to order [Active] City of Santa Cruz Seabright - Gigapower Completed - Able to order [Active] City of San Diego Normal Heights - Gigapower Completed - Able to order [Active] Genesee/Chateau - Gigapower Completed - Able to order [Active] City of San Jose Cypress (West) - Gigapower being Deployed [In Progress] Alum Rock - Gigapower Completed - Able to order [Active] City of Santa Clarita Five Knolls Master Community - Gigapower Completed - Able to order [Active] City of Stockton Springbrook - Gigapower Completed - Able to order [Active] City of Turlock The Estates at Voumard Ranch - Gigapower Completed - Able to order [Active] City of Valencia West Hills - Gigapower Completed - Able to order [Active] Florida City of Coconut Creek Forest Ridge - Gigapower Completed - Able to order [Active] Banyan Trails - Gigapower Completed - Able to order [Active] City of Davie Forest Ridge - Gigapower Completed - Able to order [Active] Long Lake Ranches - Gigapower Completed - Able to order [Active] The Ridge - Gigapower Completed - Able to order [Active] Long Lake Estates - Gigapower Completed - Able to order [Active] Westridge - Gigapower Completed - Able to order [Active] Ridgeview Lake Estates - Gigapower Completed - Able to order [Active] Parkwood Isle - Gigapower Completed - Able to order [Active] Winding Ridge - Gigapower Completed - Able to order [Active] Oak Knoll - Gigapower Completed - Able to order [Active] Lake Estates at Rolling Hills - Gigapower Completed - Able to order [Active] Orange Tree Lakes - Gigapower Completed - Able to order [Active] City of Deerfield Beach The Waterways - Gigapower Completed - Able to order [Active] City of Gainesville Haile Plantation - Gigapower being Deployed [In Progress] City of Homestead Isles of Oasis - Gigapower Completed - Able to order [Active] Waterstone - Gigapower Completed - Able to order [Active] Islandia - Gigapower Completed - Able to order [Active] Island of Hutchinson Diamond Sands - Gigapower Completed - Able to order [Active] City of Jacksonville Lexington Park - Gigapower Completed - Able to order [Active] Secret Cove - Gigapower Completed - Able to order [Active] Timberwoods Timberlakes - Gigapower being Deployed [In Progress] Town of Jensen Beach Pinecrest Lakes - Gigapower Completed - Able to order [Active] City of Lighthouse Point Coral Key Villas - Gigapower Completed - Able to order [Active] City of Melbourne Capron Ridge - Gigapower Completed - Able to order [Active] City of Miami West Kendall (Select Areas) - Gigapower Completed - Able to order [Active] City of Navarre Treasure Isle Estates - Gigapower Completed - Able to order [Active] City of Orlando Stoneybrook East - Gigapower Completed - Able to order [Active] Eastwood - Gigapower Completed - Able to order [Active] Vista Lakes - Gigapower being Deployed [In Progress] River Oaks at Timber Springs - Gigapower Completed - Able to order [Active] Amhurst - Gigapower Completed - Able to order [Active] Avon - Gigapower Completed - Able to order [Active] Carlisle - Gigapower Completed - Able to order [Active] Champlain - Gigapower Completed - Able to order [Active] Colonie - Gigapower Completed - Able to order [Active] Melrose - Gigapower Completed - Able to order [Active] Pembroke - Gigapower Completed - Able to order [Active] Warwick - Gigapower Completed - Able to order [Active] Waverly - Gigapower Completed - Able to order [Active] Windsor - Gigapower Completed - Able to order [Active] City of Palm Beach Gardens Mirabella at Mirasol - Gigapower Completed - Able to order [Active] Montecito - Gigapower Completed - Able to order [Active] Town of Palm City River Glenn - Gigapower Completed - Able to order [Active] City of Pembroke Pines Johnson Street (Palm through University Ave) - Gigapower Completed - Able to order [Active] Chapel Trail - Gigapower being Deployed [In Progress] Durango Estates - Gigapower being Deployed [In Progress] City of Pensacola Avondale - Gigapower being Deployed [In Progress] City of Plantation Hawk's Landing - Gigapower Completed - Able to order [Active] City of Saint Augustine 1600 Block A1A South - Gigapower Completed - Able to order [Active] City of Stuart Martin Crossings - Gigapower Completed - Able to order [Active] Tres Belle (Phase 2) - Gigapower Completed - Able to order [Active] City of Sunrise Sunrise Lakes Condominiums - Gigapower being Deployed [In Progress] City of Port Saint Lucie Cascades - Gigapower Completed - Able to order [Active] River Place on the Saint Lucie - Gigapower Completed - Able to order [Active] Lake Forest Point - Gigapower Completed - Able to order [Active] Grove Park Apartments - Gigapower Completed - Able to order [Active] Veranda Gardens - Gigapower Completed - Able to order [Active] City of Vero Beach Citrus Springs - Gigapower Completed - Able to order [Active] Pointe West - Gigapower Completed - Able to order [Active] City of Wellington Axis Wellington Green - Gigapower Completed - Able to order [Active] City of West Melbourne Westbrooke "Community" - Gigapower Completed - Able to order [Active] Manchester Lakes - Gigapower Completed - Able to order [Active] Georgia City of Acworth Lochshire Estates - Gigapower Completed - Able to order [Active] Ridge Mill - Gigapower Completed - Able to order [Active] Cambria Hills - Gigapower being Deployed [In Progress] City of Atlanta Parkview - Gigapower Completed - Able to order [Active] Kirkwood - Gigapower Completed - Able to order [Active] City of Buford Lanier Springs (-Creekside-) - Gigapower Completed - Able to order [Active] Lanier Springs (-Parkside-) - Gigapower Completed - Able to order [Active] Lanier Springs (-Waterside-) - Gigapower Completed - Able to order [Active] Sycamore Glen - Gigapower Completed - Able to order [Active] Primrose Creek (-Creekside-) - Gigapower Completed - Able to order [Active] Preserve at Reed Mill - Gigapower Completed - Able to order [Active] City of Cartersville Jackson Street - Gigapower Completed - Able to order [Active] Lee Street - Gigapower Completed - Able to order [Active] West Main Street - Gigapower Completed - Able to order [Active] Granger Drive - Gigapower Completed - Able to order [Active] West Avenue - Gigapower Completed - Able to order [Active] City of Cumming Bridgetowne - Gigapower Completed - Able to order [Active] James Creek - Gigapower Completed - Able to order [Active] City of Dacula Hamilton Mill (-Fairpointe-) - Gigapower Completed - Able to order [Active] City of Dallas Seven Hills - Gigapower being Deployed [In Progress] Cedar Mill - Gigapower Completed - Able to order [Active] 7 Hills - Gigapower Completed - Able to order [Active] City of Doraville Northwoods - Gigapower Completed - Able to order [Active] City of Douglasville Sweetwater Glen - Gigapower Completed - Able to order [Active] Perennial Walk - Gigapower Completed - Able to order [Active] City of Duluth Bridlewood - Gigapower Completed - Able to order [Active] City of Ellerslie Ellerslie Place - Gigapower Completed - Able to order [Active] City of Gainesville Heritage Point - Gigapower Completed - Able to order [Active] City of Hiram Ballentine Pointe - Gigapower Completed - Able to order [Active] City of Kennesaw The Enclave at Proctor Creek - Gigapower Completed - Able to order [Active] Legacy Park * Annandale - Gigapower Completed - Able to order [Active] * Bellingrath - Gigapower Completed - Able to order [Active] * Winterthur - Gigapower Completed - Able to order [Active] City of Lawrenceville Huff Drive (Hwy 29) - Gigapower Completed - Able to order [Active] Oak Green Park Dev. - Gigapower Completed - Able to order [Active] City of Lilburn Brookwood Enclave - Gigapower Completed - Able to order [Active] City of Loganville Shady Grove - Gigapower Completed - Able to order [Active] Unincorporated City of Marietta Kerry Creek - Gigapower Completed - Able to order [Active] City of Mcdonough Park at Westridge - Gigapower Completed - Able to order [Active] The Ivys - Gigapower Completed - Able to order [Active] City of Midland Quail Ridge - Gigapower being Deployed [In Progress] City of Milton Braeburn - Gigapower Completed - Able to order [Active] City of Oxford Gum Creek Landing - Gigapower Completed - Able to order [Active] City of Peachtree Corners Spalding Corners - Gigapower Completed - Able to order [Active] River Valley Station - Gigapower Completed - Able to order [Active] City of Roswell Nesbit Ferry Road - Gigapower being Deployed [In Progress] City of Sandy Springs Huntcliff - Gigapower Completed - Able to order [Active] City of Savannah Coffee Pointe Subdivision - Gigapower being Deployed [In Progress] City of Suwanee Westbrook Commons - Gigapower Completed - Able to order [Active] Townsend Creek - Gigapower Completed - Able to order [Active] Aberdeen - Gigapower Completed - Able to order [Active] City of Sugar Hill Creekside at Pinecrest - Gigapower Completed - Able to order [Active] City of Woodstock Eagle Watch at Towne Lake - Gigapower Completed - Able to order [Active] Unincorporated Dekalb County Lakeside Area - Broarcliff Woods East - Gigapower Completed - Able to order [Active] Illinois City of Collinsville West Park Avenue - Gigapower Completed - Able to order [Active] City of River Forest 900 Block of William - Gigapower Completed - Able to order [Active] Village of Oak Park 800 Block of Columbian Avenue - Gigapower Completed - Able to order [Active] City of Shorewood Block of Foxview Drive - Gigapower Completed - Able to order [Active] City of Woodstock The Sonatas - Gigapower Completed - Able to order [Active] Indiana City of Indianapolis Axis Apartments - Gigapower Completed - Able to order [Active] City of Bloomington Longwood-Devon - Gigapower Completed - Able to order [Active] City of Plainfield Sugar Grove/Forest Creek - Gigapower Completed - Able to order [Active] [ Partial Availability ] Kansas City of Olathe Scarborough - Gigapower Completed - Able to order [Active] City of Wichita Garden Walk - Gigapower Completed - Able to order [Active] Stonebridge - Gigapower Completed - Able to order [Active] Monarch Landing - Gigapower Completed - Able to order [Active] Kentucky City of Louisville Newburg/Shepherdsville Road - Gigapower Completed - Able to order [Active] Arlington Meadows - Gigapower being Deployed [In Progress] Chenoweth Hills - Gigapower being Deployed [In Progress] [ Partial Availability ] Locust Creek - Gigapower being Deployed [In Progress] Notting Hill - Gigapower being Deployed [In Progress] Shakes Run - Gigapower being Deployed [In Progress] Applegate Farm Apartments - Gigapower Completed - Able to order [Active] Rock Springs - Gigapower Completed - Able to order [Active] Highlands - Gigapower Completed - Able to order Little Spring Farm - Gigapower Completed - Able to order [Active] Silver Oaks - Gigapower Completed - Able to order [Active] Arbor Wood Farms - Gigapower Completed - Able to order [Active] Billtown Farms - Gigapower Completed - Able to order [Active] Primrose Meadows - Gigapower Completed - Able to order [Active] City of Prospect Norton Commons - Gigapower Completed - Able to order [Active] Louisiana City of Bossier Savannah Place - Gigapower Completed - Able to order [Active] City of Broussard Southfield - Gigapower Completed - Able to order [Active] City of Houma Southern Estates - Gigapower Completed - Able to order [Active] City of Kenner Gabriel - Gigapower Completed - Able to order [Active] City of Laplace Summerlin Lake - Gigapower Completed - Able to order [Active] Foxwood Estates - Gigapower Completed - Able to order [Active] Live Oak Landing Belle Terre - Gigapower Completed - Able to order [Active] River Oaks - Gigapower Completed - Able to order [Active] The Grove - Gigapower Completed - Able to order [Active] City of Montz County Cottage Estates - Gigapower Completed - Able to order [Active] Evangeline Estates - Gigapower Completed - Able to order [Active] City of Saint Rose Highland Oaks - Gigapower Completed - Able to order [Active] City of Sidell Chanticleer - Gigapower Completed - Able to order [Active] Michigan City of Ann Arbor Oakcliff Apartments - Gigapower Completed - Able to order [Active] Traver Ridge Apartments - Gigapower being Deployed [In Progress] City of Detroit Orleans Landing Apartments - Gigapower Completed - Able to order [Active] City of Hazel Park TBA - Gigapower Completed - Able to order [Active] Township of Pittsfield Evergreen Apartments - Gigapower being Deployed [In Progress] City of Saint Clair Shores TBD - Gigapower Completed - Able to order [Active] Township of Ypsilanti The Villas - Gigapower being Deployed [In Progress] Mississippi City of Horn Lake Fairfield Meadows - Gigapower Completed - Able to order [Active] City of Oxford Creekside Condominiums - Gigapower Completed - Able to order [Active] Faulkner Flats Apartments - Gigapower Completed - Able to order [Active] The Cottages at Hooper Hollow - Gigapower Completed - Able to order [Active] Missouri City of Independence 310 N Main St (Townhomes) - Gigapower Completed - Able to order [Active] City of Springfield Beacon Village - Gigapower Completed - Able to order [Active] City of St. Charles Talbridge - Gigapower Completed - Able to order [Active] City of St. Louis Clifton Heights - Gigapower Completed - Able to order [Active] Lemay - Gigapower Completed - Able to order [Active] Nevada City of Reno Damonte Ranch - Gigapower being Deployed [In Progress] Cyan - Gigapower Completed - Able to order [Active] City of Sparks Shadow Ridge - Gigapower Completed - Able to order [Active] The Trails at Pioneer Meadows Apartments - Gigapower Completed - Able to order [Active] Waterstone at Kiley Ranch Apartments - Gigapower Completed - Able to order [Active] Frontera at Pioneer Meadows - Gigapower Completed - Able to order [Active] North Carolina City of Apex Charleston Village - Gigapower Completed - Able to order [Active] Sutton Place - Gigapower Completed - Able to order [Active] Salem Villages - Gigapower Completed - Able to order [Active] Pemberley - Gigapower Completed - Able to order [Active] Whitehall Manor - Gigapower Completed - Able to order [Active] City of Carrboro Hillsborough Road (Main - Greensboro St.) - Gigapower Completed - Able to order [Active] City of Cary Stonegate Sherborne - Gigapower Completed - Able to order [Active] Oxford Hunt - Gigapower Completed - Able to order [Active] Trappers Run - Gigapower Completed - Able to order [Active] Park Village - Gigapower being Deployed [In Progress] Olde Salem - Gigapower Completed - Able to order [Active] City of Chapel Hill Meadowmont - Gigapower Completed - Able to order [Active] The Montclaire - Gigapower Completed - Able to order [Active] City of Charlotte Coulwood - Gigapower Completed - Able to order [Active] Skyhouse Uptown - Gigapower Completed - Able to order [Active] Chapel Cove - Gigapower Completed - Able to order [Active] Enderly Park - Gigapower Completed - Able to order [Active] Wesley Heights - Gigapower Completed - Able to order [Active] Ashley Park - Gigapower Completed - Able to order [Active] Frazier Park - Gigapower Completed - Able to order [Active] Bryant Park - Gigapower Completed - Able to order [Active] Brookmere - Gigapower Completed - Able to order [Active] City of Dallas Long Creek Meadows - Gigapower Completed - Able to order [Active] Alder Ridge - Gigapower Completed - Able to order [Active] City of Davidson St. Alban's - Gigapower Completed - Able to order [Active] City of Durham Watts-Hillandale - Gigapower being Deployed [In Progress] Stadium Heights - Gigapower Completed - Able to order [Active] Village Green Cherrycrest - Gigapower Completed - Able to order [Active] City of Fletcher River Stone - Gigapower Completed - Able to order [Active] City of Garner Adam's Point - Gigapower Completed - Able to order [Active] City of Goldsboro North Creek - Gigapower Completed - Able to order [Active] City of Holly Springs Sunset Oaks - Gigapower Completed - Able to order [Active] City of Mint Hill Summerwood - Gigapower Completed - Able to order [Active] City of Raleigh Laneridge - Gigapower Completed - Able to order [Active] Hayes-Barton - Gigapower Completed - Able to order [Active] Drewry Hills - Gigapower Completed - Able to order [Active] Country Club Hills - Gigapower Completed - Able to order [Active] Lark Park - Gigapower Completed - Able to order [Active] Valley Estates - Gigapower Completed - Able to order [Active] Carriage Bluffs - Gigapower Completed - Able to order [Active] North Hills - Gigapower Completed - Able to order [Active] Glen Forest - Gigapower Completed - Able to order [Active] Long Lake - Gigapower Completed - Able to order [Active] Blalock's Glen - Gigapower Completed - Able to order [Active] City of Wake Forest Stonegate - Gigapower Completed - Able to order [Active] City of Wilmington Barclay Place Apartments - Gigapower Completed - Able to order [Active] Ohio City of Cleveland Kamm's Corners - Gigapower Completed - Able to order [Active] City of Columbus Westerville - Gigapower Completed - Able to order [Active] City of Hilliard LC Brooklands - Gigapower Completed - Able to order [Active] City of Mentor Dallas Drive - Gigapower Completed - Able to order [Active] City of Painesville Heisley Park (West End) - Gigapower Completed - Able to order [Active] City of Shaker Heights Onaway - Gigapower Completed - Able to order [Active] Fernway - Gigapower Completed - Able to order [Active] Boulevard - Gigapower Completed - Able to order [Active] Malvern - Gigapower Completed - Able to order [Active] Oklahoma City of Collinsville Carriage Park - Gigapower Completed - Able to order [Active] City of Edmond Silverhawk - Gigapower Completed - Able to order [Active] Wynchase - Gigapower Completed - Able to order [Active] City of Moore Apple Landing - Gigapower Completed - Able to order [Active] Bryant Place - Gigapower Completed - Able to order [Active] City of Oklahoma City Knob Hill Addition (Partial) - Gigapower Completed - Able to order [Active] Talavera - Gigapower Completed - Able to order [Active] Westgate - Gigapower Completed - Able to order [Active] Bentwood Creek - Gigapower Completed - Able to order [Active] 3300 Block of NW 26th Street - Gigapower Completed - Able to order [Active] City of Owasso 98 Apartments - Gigapower Completed - Able to order [Active] Lake Valley - Gigapower Completed - Able to order [Active] Maple Glenn - Gigapower Completed - Able to order [Active] Carrington Pointe - Gigapower Completed - Able to order [Active] Sheridan Crossing - Gigapower Completed - Able to order [Active] The Crossing at 86th Street - Gigapower Completed - Able to order [Active] The Lakes at Bailey Ranch - Gigapower Completed - Able to order [Active] Nottingham Hill - Gigapower Completed - Able to order [Active] Camelot Estates - Gigapower Completed - Able to order [Active] Park Place - Gigapower Completed - Able to order [Active] Stone Canyon - Gigapower Completed - Able to order [Active] The Ridge - Gigapower Completed - Able to order [Active] City of Skiatook Cooper Landing - Gigapower Completed - Able to order [Active] City of Yukon Chisholm Run - Gigapower Completed - Able to order [Active] Breakers West - Gigapower Completed - Able to order [Active] Timber Creek Estates - Gigapower Completed - Able to order [Active] South Carolina City of Aiken Cedar Creek - Gigapower Completed - Able to order [Active] City of Clover Revere at Lake Wylie Apartments - Gigapower Completed - Able to order [Active] City of Florence Villa Toscanna - Gigapower being Deployed [In Progress] Waverly Woods - Gigapower being Deployed [In Progress] City of Goose Creek Longleaf - Gigapower Completed - Able to order [Active] City of Mount Pleasant Park West - Gigapower being Deployed [In Progress] City of North Charleston Cedar Grove - Gigapower Completed - Able to order [Active] City of Summerville Myers Mill - Gigapower Completed - Able to order [Active] Tennessee City of Arlington Village of Summer Meadows - Gigapower Completed - Able to order [Active] City of Nashville Sylvan Heights - Gigapower Completed - Able to order [Active] Artisan on 18th - Gigapower Completed - Able to order [Active] Ashley Green - Gigapower Completed - Able to order [Active] City of Spring Hill The Grand Reserve - Gigapower Completed - Able to order [Active] City of White House Magnolia Village - Gigapower Completed - Able to order [Active] Texas City of Austin Allandale - Gigapower Completed - Able to order [Active] Meadows of Brushy Creek (Partial) - Gigapower Completed - Able to order [Active] Pearsons Ranch - Gigapower Completed - Able to order [Active] Steiner Ranch - Gigapower Completed - Able to order [Active] Retreat at North Bluff - Gigapower Completed - Able to order [Active] Avery Ranch Glenfield - Gigapower Completed - Able to order [Active] Broadstone Travesia - Gigapower Completed - Able to order [Active] City of Cedar Hill Midtown Cedar Hill Apartments - Gigapower Completed - Able to order [Active] Winterhaven Estates - Gigapower Completed - Able to order [Active] City of Cibolo Cibolo Vista Estates - Gigapower Completed - Able to order [Active] City of Dallas Crest at Oak Park - Gigapower Completed - Able to order [Active] Preston Villas Apartments - Gigapower Completed - Able to order [Active] City of Desoto Newpark Blvd - Gigapower Completed - Able to order [Active] Summit Park - Gigapower Completed - Able to order [Active] City of El Paso Puerta Villa At Cimarron - Gigapower Completed - Able to order [Active] The View at Montecillo Apartments - Gigapower Completed - Able to order [Active] Venue At Montecillo Apartments - Gigapower Completed - Able to order [Active] Cross Pointe Apartments - Gigapower Completed - Able to order [Active] The Bungalows at Hueco Estates - Gigapower Completed - Able to order [Active] The Cottages at Edgemere - Gigapower Completed - Able to order [Active] Las Torres Apartments - Gigapower Completed - Able to order [Active] Tres Palmas Apartments - Gigapower Completed - Able to order [Active] Paseo Palms Apartments - Gigapower Completed - Able to order [Active] Cimarron Sky - Gigapower Completed - Able to order [Active] Cimarron Cove - Gigapower Completed - Able to order [Active] Tierra Del Este - Gigapower Completed - Able to order [Active] Mesquite Trails - Gigapower Completed - Able to order [Active] Lomas Del Sol - Gigapower Completed - Able to order [Active] Los Balcones Apartments - Gigapower Completed - Able to order [Active] Phoenix Apartments - Gigapower Completed - Able to order [Active] City of Fulshear Cross Creek Ranch - Gigapower Completed - Able to order [Active] City of Fort Worth Fossil Park - Gigapower being Deployed [In Progress] Summerfields - Gigapower being Deployed [In Progress] Fossil Creek - Gigapower being Deployed [In Progress] Reatta Ranch - Gigapower Completed - Able to order [Active] City of Grand Prairie Mira Lagos - Gigapower Completed - Able to order [Active] City of Haslet Dorado Ranch - Gigapower Completed - Able to order [Active] City of Houston Glenshire East - Gigapower Completed - Able to order [Active] Braeburn Valley West - Gigapower Completed - Able to order [Active] Northfield - Gigapower Completed - Able to order [Active] West & Fondren Apts - Gigapower Completed - Able to order [Active] Braes Heights - Gigapower Completed - Able to order [Active] Ayrshire - Gigapower Completed - Able to order [Active] City of Leander Hawkes Landing - Gigapower Completed - Able to order [Active] Oak Creek - Gigapower Completed - Able to order [Active] Caballo Ranch - Gigapower Completed - Able to order [Active] Sarita Valley - Gigapower Completed - Able to order [Active] Travisso - Gigapower Completed - Able to order [Active] Cold Springs - Gigapower Completed - Able to order [Active] Hazlewood - Gigapower Completed - Able to order [Active] Crystal Falls - Gigapower Completed - Able to order [Active] Mason Hills - Gigapower Completed - Able to order [Active] Connelly's Crossing - Gigapower Completed - Able to order [Active] Westview Meadows - Gigapower Completed - Able to order [Active] Benbrook Ranch - Gigapower being Deployed [In Progress] [ Partial Availability ] Villas at Vista Ridge - Gigapower Completed - Able to order [Active] Savannah Ranch - Gigapower Completed - Able to order [Active] Pecan Creek - Gigapower Completed - Able to order [Active] Trails of Shady Oak - Gigapower Completed - Able to order [Active] Magnolia Creek - Gigapower Completed - Able to order [Active] Northside Meadows - Gigapower Completed - Able to order [Active] Summerlyn - Gigapower Completed - Able to order [Active] Vista Ridge Estates - Gigapower Completed - Able to order [Active] Reagan's Overlook - Gigapower Completed - Able to order [Active] Scottsdale Crossing - Gigapower Completed - Able to order [Active] Bryson - Gigapower Completed - Able to order [Active] Catalina Ranch - Gigapower Completed - Able to order [Active] Palmera Ridge - Gigapower Completed - Able to order [Active] Greatwood - Gigapower Completed - Able to order [Active] Stewart Crossing - Gigapower Completed - Able to order [Active] City of Lubbock Quincy Park - Gigapower Completed - Able to order [Active] Lion Country Estates - Gigapower Completed - Able to order [Active] The Icon - Gigapower Completed - Able to order [Active] Tuscany Place - Gigapower Completed - Able to order [Active] Windsor Creek - Gigapower Completed - Able to order [Active] Escondidio - Gigapower Completed - Able to order [Active] Portofino - Gigapower Completed - Able to order [Active] Bacon Crest - Gigapower Completed - Able to order [Active] Bella Mia Estates - Gigapower Completed - Able to order [Active] Fountain Hills Estates - Gigapower Completed - Able to order [Active] Fox Ridge - Gigapower Completed - Able to order [Active] Kelsey Park - Gigapower Completed - Able to order [Active] Milwaukee Ridge - Gigapower Completed - Able to order [Active] North by Northwest - Gigapower Completed - Able to order [Active] Orchard Park - Gigapower Completed - Able to order [Active] Oakmont Estates - Gigapower Completed - Able to order [Active] Quincy Park - Gigapower Completed - Able to order [Active] Primrose Pointe - Gigapower Completed - Able to order [Active] The Trails - Gigapower Completed - Able to order [Active] Vintage Township - Gigapower Completed - Able to order [Active] City of Rosenberg Kingdom Heights - Gigapower Completed - Able to order [Active] City of Mesquite Town East Estates - Gigapower Completed - Able to order [Active] City of Richardson Duck Creek - Gigapower being Deployed [In Progress] City of Round Rock Eagle Ridge - Gigapower Completed - Able to order [Active] City of San Antonio PURE View at TPC - Gigapower Completed - Able to order [Active] Agave on St. Marys - Gigapower Completed - Able to order [Active] SouthTown Flats on Probant - Gigapower Completed - Able to order [Active] Big Tex Flats on Blue Star - Gigapower Completed - Able to order [Active] Polo Club on Marbach Rd - Gigapower Completed - Able to order [Active] Pacos Flats - Gigapower Completed - Able to order [Active] Dalian Monterrey Village - Gigapower Completed - Able to order [Active] Tacara at Westover Hills - Gigapower Completed - Able to order [Active] Stone Ranch at Westover Hills - Gigapower Completed - Able to order [Active] Villas in Westover Hills - Gigapower Completed - Able to order [Active] The Falls at Westover Hills - Gigapower Completed - Able to order [Active] Cascadia Apartments - Gigapower Completed - Able to order [Active] The View at Westover Hills - Gigapower Completed - Able to order [Active] Springs at Alamo Ranch - Gigapower Completed - Able to order [Active] Blue Skies of Texas - Gigapower Completed - Able to order [Active] Denver Heights - Gigapower Completed - Able to order [Active] Hotwells - Gigapower Completed - Able to order [Active] Brookside - Gigapower Completed - Able to order [Active] Highland Park Est. - Gigapower Completed - Able to order [Active] Harlandale NE - Gigapower Completed - Able to order [Active] Harlandale SW - Gigapower Completed - Able to order [Active] Government Hill (Non Historic) - Gigapower Completed - Able to order [Active] Monticello Park - Gigapower Completed - Able to order [Active] Lincolnshire/Willow Park South - Gigapower being Deployed [In Progress] Lincolnshire/Willow Park North - Commerce to MLK - Gigapower Completed - Able to order [Active] Amhurst - Gigapower Completed - Able to order [Active] Alamo Ranch (Enclave) - Gigapower Completed - Able to order [Active] Lackland Terrace I - Gigapower Completed - Able to order [Active] Lackland Terrace III - Gigapower Completed - Able to order [Active] Near Eastside - Gigapower Completed - Able to order [Active] Dignowity Hill (Historic) - Gigapower Completed - Able to order [Active] New Territories - Gigapower Completed - Able to order [Active] The Glen (Partial Availability) - Gigapower Completed - Able to order [Active] Solana Ridge (Partial Availability) - Gigapower Completed - Able to order [Active] Indian Creek - Gigapower Completed - Able to order [Active] Pasadena Heights - Gigapower Completed - Able to order [Active] Dellcrest Park - Gigapower Completed - Able to order [Active] Champions Manor - Gigapower Completed - Able to order [Active] Hillcrest SUBD UT-1 - Gigapower Completed - Able to order [Active] Wolf Creek - Gigapower Completed - Able to order [Active] Sundance Square I - Gigapower Completed - Able to order [Active] Sundance Square II - Gigapower Completed - Able to order [Active] Bella Vista Cottages - Gigapower Completed - Able to order [Active] Slate Creek Townhomes - Gigapower Completed - Able to order [Active] Enclave at Lakeside - Gigapower Completed - Able to order [Active] Aviator at Brooks City Base - Gigapower Completed - Able to order [Active] City of Schertz Riata - Gigapower Completed - Able to order [Active] City of Spring The Grayson Apartments - Gigapower Completed - Able to order [Active] Parkside Place Apartments - Gigapower Completed - Able to order [Active] Waterford Trails - Gigapower Completed - Able to order [Active] Landmark at Spring Cypress - Gigapower Completed - Able to order [Active] The Belvedere - Gigapower Completed - Able to order [Active] Alexan Spring Crossing - Gigapower Completed - Able to order [Active] Broadstone Harmony - Gigapower Completed - Able to order [Active] Alexan Auburn Lake - Gigapower Completed - Able to order [Active] Bridgestone Lakes - Gigapower Completed - Able to order [Active] Sovereign Spring Cypress Apartments - Gigapower Completed - Able to order [Active] The Venue Apartments - Gigapower Completed - Able to order [Active] Waterstone - Gigapower Completed - Able to order [Active] Rise Spring Cypress - Gigapower Completed - Able to order [Active] The Woodlands Lodge Apartments - Gigapower Completed - Able to order [Active] Wisconsin City of Appleton Riverheath - Gigapower Completed - Able to order [Active] City of Madison The View at Grandview Commons Apartments - Gigapower Completed - Able to order [Active] City of Menasha North Shore Apartments - Gigapower Completed - Able to order [Active] Prairie Lake Estates - Gigapower Completed - Able to order [Active] List Updated Continually - Please Reply to Thread with State, City, andName of Neighborhood/Residential Complex to be Added. -Thank You Last Update: June 8th, 2017 (@) 8:00 AM [CST]

Gigapower in my neighborhood

$
0
0
My neighbor's address shows he can get 1Gb service (he has uverse now). My address shows I can only get 25Mb. We are both fed from the same fiber ped in my back yard. I've tried 4 times now to get this fixed by attcares, but the answer they tell me they are getting after 3-5 days of checking is that I can't get more than 25. Is there any technical reason for this or am I just dealing with incompetent people? I'm trying to understand if I should file an FCC complaint or if there is a real technical reason why it can't happen.

It's hard to get ATT services....

$
0
0
I wanted to post and tell my story and see if someone has any ideas about how one can get their missed up order installed. I have ATT service with Direct TV and ATT wireless. On June 30th I called and ordered Home phone and Internet. I was given a install date of today July 14th and told I would receive a conformation email within 24 hours. The next day having not received anything I called back. The rep looked at my account and was upset when she saw what had been done. My order was placed completely wrong and they had opened a entirely new account for me and had ordered me a second DirecTV service along with the phone and internet! She also noted that even then the order had not been placed correctly and would have never completed. She took over an hour with me on the phone and backed all of that out. She then placed the order as it should have been done. She was apologetic and said she was sorry that they were wasting my time. Great service. One week later I received a DirecTv bill in the mail and knew the issues were back. I called in again and talked with an agent who I now know was totally not prepared to do her job. She told me things that I know now are just not true and even though I was locked out of all of my online DirecTV services she could not fix it and said that no one could, I would have to wait for up to 3 billing cycles for it to be resolved. Today was the appointment day and I bet you already know what is coming. 21 minutes before the end of my install window I received a text saying that they might not make it by the end of the window. Did I want to keep the appointment and wait? Well I have already invested ALL day here so sure. I was aggravated, so I called in to see what they could tell me and see if they could fix the mess they had made my DirecTv account. This rep was great! She did fix all of the problems with my online services and called dispatch for me, they said don't give up on us we'll be there in 1 to 2 hours. This was 4 o'clock. At 8:30 no one had showed or called. No text. So I called back. This time I was told we were too busy today and they could not come, we can reschedule for July 24th! I said you miss your appointment and then I have to wait 10 more days- a total of 25 days since the order is placed? YES. As I was expressing my unhappiness about that, I heard a busy signal on the line and the agent was gone. He had said he would call me back if we were disconnected, so I waited. After a few minutes it was clear that no one was going to call back, so I called in again. This time I was told that date was no longer available (He had not reserved it) and the next date was for July 26h now. So after wasting hours of my time and all of my day today- we still have to wait 12 more days for the install? YEAH. I asked for the supervisor. Nice man who could not ever get my name right. He said there is no way to get the date before that but it would be "Priority" and so it would happen. We talked about why all appointments are not Priority and he said he'd give me a $25 bill credit. Does anyone know of some way to just get my services installed. It just should not be this hard. My house is already connected. Do the CO work. Make the cross connect. Bring out the RG and plug it in. Use the activation system and get it on. DONE. WHY does this need to take 27 days.

Slower U-Verse speeds after upgrade

$
0
0
I upgraded to 45/6 Mbps year ago. I was consistently getting 50/5.6 Mbps. 10 days ago, I upgraded to 100/20, mainly because it was cheaper (I was paying $77 + $7 for modem and was offered 75Mbps for $10 more as a existing customer), However, when I plugged my address as a new customer, I got offer for $50 for 50 Mbps and $60 for 100/20 Mbps including modem (price would go $10 after 12 or 24 months). So I switched to 100/20. My speeds dropped from 50/5.6 to 30/4.6 Mbps. After few chats, they sent tech who did not fix anything nor he left any explanation (my dad was at home). Tech must have been in a hurry since he left lose connection on one of the post terminals. After another chat, AT&T rep sent me new modem, Arris NVG599 but this did not solve the problem. So I started another chat and rep promised to sent their most experienced tech next afternoon (rep gave me the window 4-8 pm PST). I left my work early to meet him but nobody showed up. Needless to say I feel very disappointed with AT&T as every time I talk or chat with them they assure me that they will take care of problem right away. Just feel like I am getting run around. Maybe switching to 75 Mbps plan would work better? Here are statistics for my connection: Modem: Arris NVG599 Broadband Status Broadband Connection Source DSL Broadband Connection Up Broadband IPv4 Address 45.30.29.109 Gateway IPv4 Address 45.30.28.1 MAC Address d0:39:b3:6b:7c:71 Primary DNS 68.94.156.8 Secondary DNS 68.94.157.8 Primary DNS Name dns156r8.sbcglobal.net Secondary DNS Name dns157r8.sbcglobal.net MTU 1500 DSLAM Vendor ID b5004244434db0cb DSL Status Line State Up Downstream Sync Rate (kbps) 32222 Upstream Sync Rate (kbps) 5043 Downstream Max Attainable Rate (kbps) 90235 Upstream Max Attainable Rate (kbps) 19437 Modulation VDSL2 Data Path Interleaved Downstream Upstream SN Margin (dB) 23.1 22.4 Line Attenuation (dB) 16.5 13.5 Output Power(dBm) 8.7 -17.9 Errored Seconds 0 0 Loss of Signal 0 0 Loss of Frame 0 0 FEC Errors 0 64 CRC Errors 0 0 Timed Statistics 15 Min Cur Day Showtime Last Showtime Total Errored Seconds (ES) 0 0 0 0 0 Severely Errored Seconds (SESL) 0 0 0 0 0 Unavailable Seconds (UASL) 0 58 0 0 58 FEC Errors 0 0 0 0 0 CRC Errors 0 0 0 0 0 DSL Initialization Timeouts 0 0 0 0 0 IPv6 Status Available Service Type 6rd 6rd Prefix 2602:300::/28 MTU 1472 IPv4 Statistics Transmit Packets 11950 Transmit Errors 0 Transmit Discards 0 Transmit Bytes 1464593 Receive Packets 12297 Receive Errors 0 Receive Discards 0 Receive Bytes 8310815 PTM Receive PDUs 12297 IPv6 Statistics Transmit Packets 732 Transmit Errors 0 Transmit Discards 0

Strange Email Problem

$
0
0
Sorry for the long lead in but I need to add a little background on my problem. I purchased a Huawei Honor 8 phone last week and it came with free glass breakage coverage if it was registered on their US site. It seems like Huawei has implemented an authentication program that requires them to email you an authentication code for any single change you make on their website. If you wanted to change your email, you'd have to receive a code for initial login, another code for the change request, another code to send the request to the new email and a 4th code once you click on the change request. I tried over and over again for 4 days using 6 different bellsouth.net email address I have on my account. I never received a one of the codes and I must have requested 30 to 40 of them. I called support and after holding for an hour, I got disconnected so I tried chat. Every one of the agents had Spanish names and the first 3 disconnected me after 10 minutes of chatting. The 4th gave me a ticket and said I'd receive an email within 15 minutes, but I never got it. Sooo, I tried their Facebook support people that told me no problem, they would handle it. 2 days later I received a Facebook message that they had emailed me the code, never got it. The way I finally registered the damn phone was by using a Hotmail address. I didn't want to use that address but I can't change it because that would require a code being sent to the Bellsouth email. I did make several changes, among them turning off the authentication feature but the new email change still requires them to send a one time authentication through AT&T. I don't believe it is on my end because all my accounts check the mail through Outlook on the same network and I even tried using my neighbors Charter wifi. Could AT&T be blocking the mail from Huawei's servers and is there any easy way to know for sure? And they are not going to spam, that's the first thing I tried.

Just switched from Cox to Gigapower - Questions

$
0
0
First thing I did was put my Netgear x4s router behind the RG (Pace 5268). It was a headache to be honest, when I thought it'd take less than 5 minutes. At first I just put the 5268 into DMZ+ with my router, terrible speeds (getting around 100 down). After an hour and a half of figuring out why it's bottlenecking (checking with different ethernet cables/devices,etc.), what finally allowed me to get 900~ was to put my router into AP mode. Anyways, that's taken care of and it's been working fine all day. Only thing that I miss from Cox was that I was getting about 10ms less on League of Legends. Now I have some questions: 1. Should I disable IPv6? I saw that ATT uses 6rd. I was running real IPv6 on cox. 2. Sometimes youtube buffers, first thing I thought of was changing the DNS. I just have to change the DNS settings on my netgear router correct? 3. Is running AP mode on my router correct? Thank you!

AT&T phase out of copper pots

$
0
0
I was talking to an AT&T line tech the other day. He said that as early as 2020 that AT&T was going to stop installing copper pots in some areas for new customers. I'd already heard that originally the idea was to support hard to reach spots and last-mile issues. However the plan now is to migrate everyone possible to voip whenever possible. He mentioned some type of hotspot device that would be used for landline migration. Does anyone have a link to an industry article that discusses this topic in detail?

New Customer; Optimizing An Install/Order, Questions

$
0
0
I had an order set up with AT&T a few months ago and got some useful advice from the folks here. Unfortunately, I'm an idiot, and canceled that order to stay with Cox; since I'm back here you can guess how that worked out for me. 😆 Going to place a new order on Monday. A few questions: 1. Tips on getting my address qualified for 100/20? Database only shows 50/10. It's an MDU. I've been told that MDUs are frequently artificially capped at 50 due to inside wiring concerns. Existing inside wiring is non-twisted four wire (red/green/yellow/black) cable. It has faux dial tone so I presume it's "active." VRAD is less than 30 meters away. Single family dwellings in the neighborhood show eligible for 100/20. If necessary a new wiring run would be child's play; pedestal is near my unit and a single wall penetration is all that would be required. This is the path Cox took. This would actually be ideal because none of the existing jacks are near my computer, which requires a hard wired connection; I'm not allowed to use WiFi for work. 2. Can I request a specific RG? I've read the 5268 is not ideal if you need to use your own router, which I do, preferably with functional IPv6, although from what I've gleaned here I may have to forgo IPv6 for the time being? 3. Do the unadvertised local-only TV packages (shown in my market at $20 or $30 with HD) give you the unlimited data add on? 4. Does ordering Uverse video help with #1, if they have to install new wiring or some such? DirectTV is not an option; no view of the southern sky. :) 5. Are they no longer charging equipment fees? Don't see any on the website....

[LA] Questions Regarding New Service

$
0
0
I didn't know if I should post this in a similar thread or make my own - I don't like hijacking other's threads. So I made my own.. I am pretty sure I need to switch to AT&T soon to get some reliable internet...hopefully..I have Cox now and can't get reliable service no matter how hard I try. Anyway, my loop length is about 2300' and I've got two wires coming into the NID, a 26ga and a 22ga.. The second line was added sometime after 2005, not sure when. The original is the original 40yr old wire that has been here since the house was built, or so I believe. On the website I qualify for the 50/10 tier AND I am in an area actively being converted to FTTH. Crews haven't placed a fiber crossbox next to my DSLAM yet, but my DSLAM is 150' from one they've already placed a fiber crossbox next to and are trenching fiber to at this very moment. So some questions. :) 1. Is there any way to check the line quality prior to ordering service? 2. Is there a way to tell if the newer wire is "replacing" the older one or is it for pair bonding? 3. And is there even the slightest chance I can get AT&T to replace that older wire with a newer 22ga one given the fact that I'm in an area being converted to FTTH? 4. Should I just wait for Fiber and then order service? Will ordering DSL service now affect my chances of getting FTTH? Thanks for the help. :D

$Obligations of new customer if quick cancel due to non satisfaction?

$
0
0
All, Gigapower is available in my neighborhood. I currently have adequate, stable cable modem service. I am considering giving AT&T a try, but I can't seem to find comprehensive terms for the 12 month contract online. The below question I can not figure out and hope that some experienced folks here can illuminate. If I request an installation, but am not satisfied with the performance that I get, then cancel (quickly, say on the day of installation or any other time window that is relevant), what costs do I remain obligated for? Is it $180 + installation fee ($99?)? Is there an early escape clause? It does not appear that there are any service level guarantees provided by AT&T.

ADSL2 + IPV6 Native

$
0
0
With all the talk about ATT going dual stack now, I can't help but think they'll leave use folks on adsl2 out of the loop. I've got the built in 6rd tunnel working on my nvg510 and feeding my local network. It normally only hands out a single /64 prefix and route which makes it mostly useless. But since I got root on my 510, I just telnetted in and added the whole /60 prefix route so I have access to all my trillion IP addresses. But it is still tunneled... and try as I might through telnet, I can't get it to grab a native block from the WAN side. I managed to grab some copies of the nvg589 and 599 firmwares and extract them and I see they have dedicated conf pages to manage your ipv6 blocks. So that sounds nice. Question is, can I just buy one off of ebay and plug it in and it will work? Or am I just screwed? I hesitate to call in and ask for a modem as I can already see the rep setting my port to vdsl and when that fails to work, then they'll inform me that adsl isn't offered in my area any more lol
Viewing all 11270 articles
Browse latest View live


Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>